12-Month Zero-Notice Compliance — High-Rise Residential, Gurugram
- Client
- Confidential builder
- Site area
- Tower footprint 1,500 sqm
- Duration
- Ongoing — 12+ months
The challenge
HSPCB inspections every 45 days. Earlier consultant had triggered two notices in 6 months due to delayed audit uploads.
What we did
- ▸Replaced the dust-control plan with a 40-point DPCC-spec checklist
- ▸Installed 8MP PTZ cameras with 30-day NVR backup at all four corners
- ▸Monthly audit reports drafted and uploaded by the 5th of every month
- ▸Quarterly preventive maintenance on anti-smog gun and sprinklers
Outcome
- ✓Zero notices in 12 months of operation
- ✓AQI sensor uptime 99.4% (verified on HSPCB dashboard)
- ✓Inspection response time cut from 5 days to under 24 hours
"Knowledgeable team, fast equipment supply, audit reports on time every month."