Sector 68, Gurugram

RMC Plant Consent + Full Compliance Kit in 12 Days — Gurugram

Client
Ready-Mix Concrete operator
Site area
1,900 sqm plant footprint
Duration
12 days end-to-end

The challenge

New RMC batching plant needed HSPCB Consent to Establish plus a full dust-control stack before commissioning could begin. Client had already lost 3 weeks with a previous consultant who filed an incomplete application.

What we did

  • Fresh CTE application filed on the HSPCB portal with a corrected dust-mitigation plan
  • Three-sided tin-sheet enclosure with wind-breaker mesh installed around the mixer
  • 50m throw anti-smog gun deployed at the loading bay with continuous sprinkler ring
  • CPCB-listed AQI sensor mounted at 4m with 4G uplink to HSPCB API
  • Four PTZ cameras with 30-day NVR covering mixer, loading bay, exit gate and stockpile

Outcome

  • CTE issued on day 12 with no re-inspection required
  • Commissioning began the same week without loss of scheduled dispatch
  • Client moved to annual audit-report AMC after go-live

"Twelve days from paperwork chaos to a fully approved plant. Every single item on the officer's checklist was ready when he arrived."

Rajesh Sharma, Plant Head