Greater Kailash, South Delhi

GRAP-3 Show-Cause Notice Closed in 9 Days — South Delhi Builder Floor

Client
Boutique residential developer
Site area
950 sqm plot, 4-storey builder floor
Duration
9 days from notice to closure

The challenge

Show-cause notice issued during GRAP-3 alleging active excavation, no visible smog gun, and PTZ camera offline. Notice carried a proposed ₹2 lakh environmental compensation and a 7-day reply deadline.

What we did

  • Same-day audit with geotagged photographs of every dust-control measure in operation
  • PTZ camera 4G router replaced within 24 hours; feed restored on DPCC portal
  • Excavation paused and formally logged; interior work continued with photo evidence
  • Clause-by-clause written response filed on portal and hand-delivered at zonal office
  • Re-inspection requested within 5 days with a complete corrective-action annexure

Outcome

  • Notice formally closed on day 9 with zero compensation levied
  • Site moved to weekly PTZ health checks to prevent recurrence
  • Zero further notices for the remaining GRAP season

"The notice looked terminal. Nine days later the file was closed with no penalty — the clause-by-clause response made the difference."

Ankit Verma, Developer