GRAP-3 Show-Cause Notice Closed in 9 Days — South Delhi Builder Floor
- Client
- Boutique residential developer
- Site area
- 950 sqm plot, 4-storey builder floor
- Duration
- 9 days from notice to closure
The challenge
Show-cause notice issued during GRAP-3 alleging active excavation, no visible smog gun, and PTZ camera offline. Notice carried a proposed ₹2 lakh environmental compensation and a 7-day reply deadline.
What we did
- ▸Same-day audit with geotagged photographs of every dust-control measure in operation
- ▸PTZ camera 4G router replaced within 24 hours; feed restored on DPCC portal
- ▸Excavation paused and formally logged; interior work continued with photo evidence
- ▸Clause-by-clause written response filed on portal and hand-delivered at zonal office
- ▸Re-inspection requested within 5 days with a complete corrective-action annexure
Outcome
- ✓Notice formally closed on day 9 with zero compensation levied
- ✓Site moved to weekly PTZ health checks to prevent recurrence
- ✓Zero further notices for the remaining GRAP season
"The notice looked terminal. Nine days later the file was closed with no penalty — the clause-by-clause response made the difference."