Continuous Dust Monitoring & Suppression Systems
Dust control is not one product — it is a system. We design and install integrated dust-monitoring and suppression setups that combine continuous AQI sensors, anti-smog guns, perimeter sprinklers and green nets. Every component reports up to the DPCC portal automatically.
Treating dust control as a shopping list is the easiest way to end up with an expensive collection of equipment that still fails inspection. A sensor without sprinklers shows you the problem without solving it. An anti smog gun without a calibrated monitor leaves you guessing whether you are doing enough. Green nets and barricades without a wheel washing pit at the gate simply move the dust onto the public road.
We design dust control as one integrated system tuned to the realities of your site. Our environmental engineer maps the prevailing wind, the location of dust generating activities, the boundary geometry and the access road usage, then designs a setup where each element compensates for the others. The sensor tells the team when to fire the gun. The perimeter sprinklers cover the boundary while the gun handles the active work area. The wheel wash captures everything that tries to leave the site.
Because every component reports up to the DPCC portal automatically, the monthly audit report writes itself. Your project manager sees one dashboard rather than chasing readings from three vendors, and inspections become routine rather than stressful.
We can retrofit this on an active site in phases without slowing construction, or design it into a new project before the first excavation. Either way you end up with a setup that satisfies DPCC, protects neighbouring residents from your dust, and gives you the documentation to prove it.
What's included
- ▸Continuous PM2.5 / PM10 monitoring
- ▸Perimeter water sprinkler systems
- ▸Anti-smog gun deployment
- ▸Green-net & tin-sheet barricading
- ▸Wheel-washing pit at site exit
Our process
- 01
Compliance audit
Map every DPCC dust-control requirement against your current site setup.
- 02
System design
One-page dust-control plan with equipment list and quotation.
- 03
Installation
Phased install with zero downtime to ongoing construction.
- 04
Monthly reporting
Audit reports filed automatically on your DPCC dashboard.
Frequently asked
Can dust monitoring be retrofitted on an active site?
Yes — we install equipment in phases so construction continues without stoppage.